Level: | 22 |
Cost: | 12 000 |
Land Required: | 2x2 |
Road Required: | No |
Electricity Required: | 10 |
Construction Time: | 08h 00m |
Construction Speed Up: | 2 |
Items Required: | None |
Benefits: | A Helicopter Pad Level 2 is required for Crossbill Helicopter maintenance. |